What is a temporary power pole?
A temporary power pole, sometimes called a temp pole or spider box on a post, is a metal pole with a meter socket and breaker panel mounted at a set height, wired by an electrician to the utility line before permanent power exists on site. It feeds tools, light tower rental units, and trailer hookups during the build. Most jobs in Woodbury pull either 100 amp or a 200 amp temporary power pole, sized to the load the crew actually needs, not the final building service. GFCI protection matters here: OSHA 1926.404(b)(1)(ii) covers ground fault protection on construction sites, and any temp pole feeding hand tools needs that coverage built in. We do not wire the pole ourselves, but we coordinate delivery timing with your electrician so the restroom trailer rental or mobile office trailer rental on site has power the same week sanitation shows up.
How much does temporary power pole installation cost?
Installation cost depends on amperage, trenching distance to the utility connection, and whether the site already has a transformer nearby. Every project in Woodbury is different, so get a written quote from your electrician before delivery day, and loop in Woodbury Porta Pros so equipment lands on the same schedule. We do not sell or install the pole itself. What we do is stage everything around it: the construction dumpster rental placed clear of the pole's service clearance, the temporary fence rental routed around the meter, and the portable toilet rental or standard porta potty rental units set where OSHA 1926.51(c) toilet ratios are met without blocking access to the panel. A handwashing station rental near the break area rounds out the setup, and 29 CFR 1910.141(d)(2) requires soap and towels or a dryer at that station, not just sanitizer.

Where should a temporary power pole go on site?
Place it close to the utility drop, clear of vehicle paths, and away from where a roll-off dumpster rental will be dropped or swapped. A dumpster delivery needs about 60 feet of straight clearance behind the truck, so map that path before the pole goes in, not after. Keep the pole out of the swing radius for a 10 yard dumpster rental or larger box, and confirm placement doesn't cross an accessible route if an ADA accessible porta potty sits nearby. ADA Standards section 403.5.1 requires 36 inches of clear width on that route, so route cords and panels around it. If the site sits near a public sidewalk, placement in the right of way needs confirming with the City of Woodbury; we have not verified a specific ordinance number for that, so ask before you dig.
How far in advance should I schedule a temporary power pole?
Book it as soon as your site plan is set, ideally before other equipment arrives, since electricians and utility inspections both take lead time. Woodbury sites near Oakdale, about 7.1 miles north, often share electrician scheduling with Woodbury crews, so early booking avoids conflicts. Coordinate with your porta potty rental Woodbury delivery for the same week.
What size temporary power pole do I need?
Most residential builds run fine on 100 amp; larger commercial sites with trailers, lifts, or 4 stall restroom trailer hookups often need the 200 amp temporary power pole. Your electrician sizes it against actual tool and equipment load, not guesswork, so share your equipment list before ordering.
Can I rent a temporary power pole with sanitation together?
Woodbury Porta Pros does not supply the pole itself, but we schedule portable restroom rental and handwashing station rental delivery around your electrician's timeline so both land the same week. Ask us for a combined delivery window when you request a quote.
Does a temporary power pole need a permit?
Most jurisdictions require an electrical permit and inspection before the utility energizes it. We have not verified Woodbury's specific permit process here, so confirm requirements and timelines with the city before scheduling your electrician.
What is a temporary power pole diagram used for?
Electricians use a diagram to show meter height, breaker panel layout, and grounding before the utility approves the connection. Ask your electrician for a site-specific diagram; it speeds up inspection and keeps placement clear of dumpsters, fencing, and event restroom rental units nearby.